CPKC Lanigan Subdivision

The Lanigan Subdivision begins on the Mainline at Regina and stretches 104.4 miles to Lanigan on the Prairie North Line.

Back to CPKC Timetables

Station Name Mile
Regina
JCT with CPKC Indian Head Sub
Yard
0.0
Interlocked Railway Crossing – CN Ross Industrial Lead 0.8
Interlocked Railway Crossing – CN Qu’Appelle Sub 1.6
Brora 7.0
Tregarva 12.2
Hot Box Detector 12.7
Craven
Siding
21.3
Silton 30.3
Gibbs 37.0
Hot Box Detector 37.1
Bulyea JCT
JCT with CPKC Bulyea Sub
Wye
42.4
Strasbourg
Siding
50.5
Duval 56.7
Cymric 62.3
Hot Box Detector 64.6
Govan 67.4
Hatfield 75.3
Interlocked Railway Crossing – CN Watrous Sub 81.1
Nokomis
Siding
81.5
Hot Box Detector 88.9
Lockwood 90.4
Drake 97.5
Lanigan
JCT with CPKC Sutherland Sub
Yard, Wye
104.4

Leave a comment

close-alt close collapse comment ellipsis expand gallery heart lock menu next pinned previous reply search share star