Metrolinx/ONR Newmarket Subdivision

The Newmarket Subdivision is operated by Metrolinx up to the end of track at mile 63.0. There is a large portion out of service until near Washago. ONR operates the remainer of the subdivision north of Washago. CN sold the Washago to North Bay portion to Ontario Northland in March 2026.

Back to Shortline/Passenger Timetables

T Station Name Mile
| Parkdale
JCT with Metrolinx Weston Sub
3.0
Davenport
Diamond – CPKC North Toronto Sub
4.6
| Spicer 9.2
| Downsview
GO
10.9
Snider South 12.1
|| Steeles
Snider South Wye
12.9
|| Snider North
Snider North Connecting Track to CN York Sub
13.7
|| Welded Tube 15.29
Y Concord 16.3
| Rutherford
GO
16.7
| Maple
GO
18.3
Teston 18.5
|| Argo and Alpha Lumber 18.68
Y Kirby 20.7
| King City
GO
22.7
| Chase 29.2
| Aurora
GO
29.9
| Machell 30.1
| Hot Box Detector 30.2
| Newmarket
GO
34.2
| East Gwillimbury
GO
35.5
| Holland 41.1
| Bradford
GO
41.5
| Lefroy
Innisfil GO
51.9
| Barrie South
GO
59.5
| Go Storage Facility 62.2
| Allandale
GO
Connection to Barrie Collingwood Railway
62.8
End of Track 63.0
↑Metrolinx Territory↑
Portion of Subdivision Abandoned
↓ONR Territory↓
| Washago
JCT with CN Bala Sub
98.9
| Gravenhurst 112.2
| Hot Box Detector 125.3
| Falkenburg
Siding
126.4
| Martins
Siding
141.5
| Huntsville 146.2
| Hot Box Detector 151.8
| Novar 155.7
| Hot Box Detector 184.3
| South River
Siding
188.8
| Trout Creek
Siding
200.7
| Hot Box Detector 209.8
| Main Track Ends 223.0
Transfer
Wye
Connection to Ottawa Valley Railway
225.7
End of Track 226.44

Leave a comment

close-alt close collapse comment ellipsis expand gallery heart lock menu next pinned previous reply search share star